Project Title: Sebago Heights Pump Station Controls Upgrade
Project Location: 26 Bittersweet Way, Windham, ME 04062

  1. Project Overview:
    The Sebago Heights Pump Station is a water booster station in Windham that is experiencing equipment failures and is in need of a controls system upgrade. Portland Water District is looking to get the controls system replaced, including:
    • Demolition of the two existing pump control panels.
    • Design and implementation of a new Telemetry panel, Domestic Pump control panel, and Emergency Fire Pump control panel.
    • Code development, integration, and testing.

Attachments

Download All Attachments

Plan Holders

  • rfytfytft5 - fytfytfg, yugyut
  • QTO Solutions - Olympia, WA
  • Construction Summary of NH/Maine & VT Inc - Manchester, NH
  • Blackridge Research & consulting - Peoria, Illinois
  • Phelan Construction - North Andover, MA
  • PlanHub - West Palm Beach, Florida
  • Automatrix, Inc - Winthrop, Maine