Slate Roof Replacement – 2025
Due Date
Questions Due
Prebid Conference
Time Remaining
33 daysBasic Info
Description
The objective of the project is to replace the existing slate roof on the remaining section of the administrative facility. Replace copper valleys and dormers within the red and green areas and tie into existing slate. Ice and water shield membrane required over roof and valleys. Sheathing repair or replacement where necessary. Although not under any historic preservation requirements, the district would like to maintain the original character of the facility. See attachment and note the green and red areas.
Materials
Slate – Areas outlined in green; replace with a true slate material. Specifications, installation, and warranty information must be submitted at time of bid.
Shingles – Areas outlined in yellow; will be replaced with 30 year asphalt shingles.
Copper – replace existing copper with 20 ounce, the only copper that will NOT be replaced in the existing cornice.
Snow Fence – There will need to be a form of snow fence along the back side of the building facing the parking lot.
Attachments
Download All AttachmentsPlan Holders
- Construction Summary of NH/Maine & VT Inc - Manchester, New Hampshire
- W.H. Demmons - Westbrook, Maine
- HBC - Lewison, Maine
- Aulson - Methuen, Massachusetts
- Heritage Co. - Waterboro, Maine