General Information

PWD Terms and Conditions

PWD Billing and Rates

Cross Connections

Construction Specifications

Section 01150 – Site Conditions

Section 01200 – Selective Demolition

Section 01300 – Submittals

Section 01710 – Cleanup

Section 02230 – Clearing

Section 02260 – Sedimentation and Erosion Control

Section 02315 – Earthwork for Water Main Construction

Section 02350 – Rock Removal

Section 02536 – Temporary Water Systems

Section 02537 – Water Distribution System

Section 02594 – Pressure Testing

Section 02595 – Disinfection

Section 02741 – Pavement

Sewer Main Construction

Standard Details

Meter Sets and Interior Piping

Backflow Prevention Configuration, effective 1/1/19

Horizontal Meter Installation(.675 – 1″), effective 1/1/19

Horizontal Meter Installation – Inline (.675 – 1″) effective 5/31/22

Horizontal Meter Installation (1.5 – 2″), effective 1/1/19

Horizontal Meter Installation (> 2″ meter) – contact MEANS

Residential Fire Sprinkler System, effective 1/1/19

Vertical Meter Installation, effective 1/1/19

Meter Bypass Installation, effective 1/1/19

Meter Booster System Installation, effective 1/1/19

Meter Pits/Vaults

Small Meter Pit, effective 1/1/19

Meter Vault (> 2″ meter ) – contact MEANS

Standard Details for Water and Sewer Main Construction

Standard Water Details

Sewer Manhole Detail

Sewer Trench Detail

New Services

Approved Tapping Contractors

Hydrant Flow Test Request Form

Policies Relating to Main Extensions and New Services

Policy 650 – Water Main Extension and Service Line Rule

Water Main and Service Line Appeals (Section 27)

Policy 620 – Water Service Standards

Chapter 675 – Infrastructure Surcharge

PWD Water Main Extension Policies

Limits of Water Main Extensions

Specifying Water Main Size

PWD Financial Contribution to Main Extensions